Explosion protection document and hazardous area classification

Do you work with flammable gases, liquids or dusts? We assess the explosion hazard, classify the zones and prepare the explosion protection document. You know the indicative price in advance.

How much does an explosion protection document cost?

The price depends on the number and complexity of the equipment and areas where an explosive atmosphere may form – a battery charging station is a different task from a paint shop, a dryer, an LNG or a hydrogen station. We charge for the time actually worked.

Current hourly rates are listed on our pricing page. After a site visit or receiving your documents we send you an estimate of the hours and a free individual quote in advance.

What is an explosion protection document

An employer where an explosive atmosphere (a mixture of flammable gases, vapours or dust with air) may form must assess the explosion risk and prepare an explosion protection document under Czech Government Regulation No. 406/2004 Coll. (EU ATEX Directive 1999/92/EC).

It includes the classification of hazardous areas into zones – zones 0, 1 and 2 for gases and vapours, zones 20, 21 and 22 for dusts – and a proposal of technical and organisational measures to prevent an explosion and minimise its consequences.

When you need the document

  • You store or use flammable liquids and gases – paint shops, thinners, flammables stores, gas-fired boiler rooms.
  • Combustible dust is produced – wood, flour, sugar, plastics, metal dusts, silos.
  • You charge traction batteries of forklift trucks or operate battery storage.
  • You operate or build LNG, CNG or hydrogen stations, filling and dispensing points.

Not sure whether this applies to you? We assess whether an explosive atmosphere can form at your site and, if not, we confirm that in writing too.

What the document contains

  • Explosion risk assessment – substances, release sources, likelihood and consequences
  • Classification of hazardous zones and their marking on drawings
  • Technical measures – ventilation, detection, explosion-proof equipment, earthing
  • Organisational measures – work procedures, work permits, training, signage
  • Requirements for equipment in each zone and links to inspections
  • Links to external influences, fire protection and emergency plans

How we proceed

  1. Documents and site visit – we review drawings, documentation and the operation on site.
  2. Quote – an estimate of hours and an individual price in advance.
  3. Preparation – text and graphic parts, printed and digital.
  4. Briefing employees – we explain the measures, mark the zones and train the operators.
  5. Updates – we amend the documentation when your operation changes.

Frequently asked questions

How much does an explosion protection document cost?

We charge for the time worked; current rates are on our pricing page. The final price depends on the number and complexity of the areas – we confirm it in a free individual quote.

Do I need the document for charging forklift batteries?

Charging lead-acid traction batteries releases hydrogen, so the explosion hazard must be assessed. Often a simple assessment and measures such as adequate ventilation are sufficient.

What are ATEX zones?

Areas where an explosive atmosphere may occur are divided according to how often and for how long it is present – zones 0, 1, 2 for gases and vapours, zones 20, 21, 22 for dusts. Equipment and measures are selected according to the zone.

Can you prepare the document for a hydrogen or LNG station?

Yes, we have experience with LNG, CNG and hydrogen filling and dispensing stations as well as energy and charging hubs.

Information on obligations is based on Czech regulations in force at the date of publication; we always assess the specific obligation according to your operation.